Garvan Point

Garvan Point

Replacing the existing sheet pile retaining wall along the Atlantic Ocean with a new 450’ long epoxy-coated sheet pile wall and forming and pouring a concrete seawall cap. The project has involved excavation and dewatering for a new beach entrance staircase and and seating area, forming and pouring new staircase and seating area, installing boulder revetment wall along sheet pile wall and  full site landscaping complete with concrete walks bench installation turf establishment and plantings.